Separate metering is an infrastructure decision: it affects utility coordination, service equipment, electrical design, installation cost, and future separation of the units. It should be evaluated before the panel and service strategy are fixed.
How to Evaluate the Utilities Decision
In this utilities decision,
If the preferred solution would involve assuming a prefab price includes site work and connections, carry that consequence explicitly in the construction scope instead of hiding it in contingency. Pay particular attention to placing the ADU where utility runs become unnecessarily difficult and treating family use and future rental use as the same design problem.
In this utilities decision, before final pricing, confirm whether the design decision changes water, sewer and electrical routing or privacy between the ADU and primary home.
What the Plans Need to Prove About Utilities
- Check setbacks, access and site fit against existing conditions before construction starts.
- Record the agreed water, sewer and electrical routing before the field sequence is released.
- Confirm privacy between the ADU and primary home before ordering, rough-in, or another trade depends on it.
- Make one party responsible to choose attached versus detached based on use, disruption and site systems.
- Name who will plan utility strategy early.
Related Work That Belongs in the Price for Utilities
| Decision test | What to ask | Why it matters |
|---|---|---|
| Problem solved | What practical utilities problem does this option solve? | Tests whether the added work earns its place in the budget. |
| Present condition | What is known about setbacks, access and site fit? | Unverified conditions should be investigated or carried openly in the price. |
| Related work | What changes in water, sewer and electrical routing? | Makes the full construction consequence visible in each option. |
| Soft costs | Does the choice add planning, engineering, permits or review? | Keeps design, engineering, permit, and review costs from disappearing outside the bid. |
| Field risk | If an issue involving assuming a prefab price includes site work and connections changes the scope, how will it be verified, priced, and approved? | Sets the approval and pricing process before unexpected work begins. |
| Closeout | What must be verified or documented before the utilities scope is closed? | Installation alone is not always the end of the documented scope. |
The construction sequence is the other half of the same decision.
Code and Inspection Considerations for Utilities
Closing the Utilities Decision Before Construction
- Verify the current field condition of setbacks, access and site fit.
- Test the chosen utilities path against one workable alternative before final approval.
- Test the preferred option against an alternative that changes privacy between the ADU and primary home.
- Carry downstream ADU work into the estimate before comparing the options.
- Record the selected utilities approach in the plans, specifications, or written scope.
- Release following trade work only after the utilities decision is documented.
The point of the comparison is not to force the cheapest option.
Utilities: Questions to Close Before Construction
Before approval, document setbacks, access and site fit, the effect on water, sewer and electrical routing, and ownership of privacy between the ADU and primary home.
- What condition already on site could make the proposed utilities solution impractical?
- What approval dependency could alter the utilities scope or sequence?
- What must be selected or delivered before the next utilities trade begins?