How to Compare the Use Case Options
Attached and detached units trade different things: privacy, disruption to the main house, utility distance, site access and the amount of new building envelope. If the preferred solution would involve assuming a prefab price includes site work and connections, carry that consequence explicitly in the defined work instead of hiding it in contingency.
Coordinate the specific choice with energy-code classification and envelope requirements because work outside the focal room can determine whether the option performs well. One condition worth testing early is using outdated local assumptions instead of current state and city rules and placing the ADU where utility runs become unnecessarily difficult.
Conditions That Control Use Case
- Verify future rental, family and accessibility needs before dependent work begins.
- Check state and local ADU rules against existing conditions before construction starts.
- Check setbacks, access and site fit against existing conditions before construction starts.
- Put responsibility for the following in writing: let future use influence accessibility, metering and separation.
- Put responsibility for the following in writing: run feasibility before architecture.
Pricing should not be finalized until the team knows whether the build choice changes water, sewer and electrical routing or privacy between the ADU and primary home. Price the focal work together with the adjacent demolition, trade work and finish restoration it creates.
Budget and Sequencing Consequences
- Verify the existing condition of future rental, family and accessibility needs before treating it as a fixed design input.
- Show the proposed work clearly enough to coordinate state and local ADU rules.
- Make the use case verification responsibility explicit in the scope.
- Do not release dependent work until the use case decision is final.
The schedule can matter as much as the price.
Permit and Review Issues for Use Case
Closing the Use Case Decision Before Construction
- Verify the existing condition of future rental, family and accessibility needs.
- Keep a second workable use case option alive until the controlling condition is verified.
- Compare at least two feasible paths against setbacks, access and site fit.
- Compare the complete use case scope created by the choice.
- Put the approved use case direction into the project documents used by the field team.
- The next trade should start only after the use case decision is documented.
The planning objective is not to force the cheapest option.
Use Case: Questions Before Mobilization
The drawing or scope should make future rental, family and accessibility needs visible, account for state and local ADU rules, and define how setbacks, access and site fit will be handled.
- What condition already on site could make the proposed use case solution impractical?
- What approval dependency could alter the use case scope or sequence?
- What must be ordered or approved before the next use case step?