How to Evaluate the Use Case Decision
Attached and detached units trade different things: privacy, disruption to the main house, utility distance, site access and the amount of new building envelope. Document the site condition that controls this choice before finishes or drawings make the option look more certain than it is.
As part of final pricing, verify whether the design decision changes water, sewer and electrical routing or privacy between the ADU and primary home. One condition worth testing early is placing the ADU where utility runs become unnecessarily difficult and treating family use and future rental use as the same design problem. If those conditions are discovered only after work begins, the surrounding scope can expand unexpectedly.
Build the financial decision around the overall job, not a single trade or square-foot number. Design, engineering, permits, temporary conditions, site work and owner-purchased items can sit outside an early construction figure.
What to Confirm on Site for Use Case
- Verify setbacks, access and site fit before dependent work begins.
- Show water, sewer and electrical routing in the plans or written scope before construction starts.
- Verify privacy between the ADU and primary home before dependent work begins.
- Make one party responsible to choose attached versus detached based on use, disruption and site systems.
- Put responsibility for the following in writing: plan utility strategy early.
Use Case: How the Choice Changes Budget and Timing
| Decision test | What to ask | Why it matters |
|---|---|---|
| Problem solved | What practical use case problem does this option solve? | Separates a useful upgrade from complexity added for its own sake. |
| Existing condition | What is known about setbacks, access and site fit? | Prevents an untested assumption from becoming an automatic change order. |
| Related work | What changes in water, sewer and electrical routing? | The comparison should include trade work and finish restoration created by the choice. |
| Soft costs | Does the choice add design development, engineering, permits or review? | Makes the all-in cost easier to compare across options. |
| Field risk | If an issue involving assuming a prefab price includes site work and connections changes the scope, how will it be verified, priced, and approved? | Creates a written path for handling a condition that changes the scope. |
| Closeout | What must be verified or documented before the use case scope is closed? | Installation alone is not always the end of the written scope. |
Coordinate the selected direction with energy-code classification and envelope requirements because work outside the focal room can determine whether the option performs well.
Requirements to Confirm Early for Use Case
Use Case: Team Verification Checklist
The written record should identify setbacks, access and site fit, explain the interaction with water, sewer and electrical routing, and name who is responsible for privacy between the ADU and primary home.
- What site condition should be verified before the use case direction is treated as buildable?
- Is there a review or inspection dependency that could change the use case sequence?
- What must be selected or delivered before the next use case trade begins?
Three Checks Before Finalizing Use Case
The use case direction should not be released until the team has checked setbacks, access and site fit, water, sewer and electrical routing, and privacy between the ADU and primary home.
Before release, verify the assumption tied to assuming a prefab price includes site work and connections. In an ADU, making that dependency explicit is usually less expensive than discovering it after another trade has committed to the original plan. For this decision, the scope also depends on setbacks, access and site fit.