
What should be considered when a new high-performance addition is attached to an older, leakier house envelope?
A high-performance addition should not be designed as an isolated airtight box attached to a leakier old house.

A high-performance addition should not be designed as an isolated airtight box attached to a leakier old house.

Yes. A new valley or roof tie-in creates a concentrated drainage and flashing condition and can expose weaknesses in the adjacent existing roof.

Whether a new foundation should be tied to the existing foundation or detailed to accommodate separate movement is a structural-engineering decision.

A low existing mortgage rate can make moving more expensive because a replacement home may require a larger balance at a higher rate.
Home remodeler Tiburon. Home remodeling in Tiburon and Marin County, CA. Call

A family can sometimes remain in the house during an addition if the occupied area stays structurally and weather protected, has safe egress and utilities.

An addition schedule should be separated into feasibility and design, survey and engineering, permit review and corrections, selections and procurement, and.

A residential addition in San Jose generally requires a building permit with plans, and the scope can also trigger structural, electrical, plumbing and.

Ask for recent permitted additions of similar structural complexity, the addresses or permit references when appropriate, who designed and engineered them.