What Should Control the Feasibility Choice
Legal eligibility is only the first screen. A useful feasibility study overlays the allowed building envelope with actual utility routes, access, grading, existing structures and the construction area needed to build the unit.
The construction documents should carry enough detail that field teams do not have to reconstruct the original conversation.
In this feasibility decision, watch particularly for assuming a prefab price includes site work and connections and ignoring access and staging for backyard construction.
Related Work That Belongs in the Price for Feasibility
- Record the existing condition of water, sewer and electrical routing before dependent work is released.
- Show the proposed work clearly enough to coordinate privacy between the ADU and primary home.
- Put responsibility for the feasibility check in writing.
- Make the final feasibility choice part of the issued scope before the next trade starts.
Requirements to Confirm Early for Feasibility
Closing the Feasibility Decision Before Construction
- Verify the existing condition of water, sewer and electrical routing.
- Compare the preferred feasibility direction with at least one workable fallback.
- Evaluate more than one buildable option before resolving energy-code classification and envelope requirements.
- Price the full feasibility scope created by the decision, not the visible item alone.
- Put the approved feasibility direction into the project documents used by the field team.
- Release dependent work only after the feasibility decision is documented.
The planning objective is to reach a buildable, understood choice.
Feasibility: Questions to Resolve Before Construction
The team should be able to point to water, sewer and electrical routing, explain the effect on privacy between the ADU and primary home, and state who is responsible for energy-code classification and envelope requirements.
- What condition already on site could make the proposed feasibility solution impractical?
- What approval dependency could alter the feasibility scope or sequence?
- Which procurement decision controls the next feasibility activity?
What the Plans Need to Prove About Feasibility
“Can my lot legally and physically support an ADU, and what should be checked before design starts?” is not only a design question. It becomes a scope question as soon as the answer affects water, sewer and electrical routing, privacy between the ADU and primary home or energy-code classification and envelope requirements.
If the selected path changes assuming a prefab price includes site work and connections, include the related demolition, rough work and restoration now. Also state what remains untouched.
Before approval, verify treating family use and future rental use as the same design problem and decide what happens if the field condition differs from the assumption. The goal is to identify unknowns while there is still time to respond without undoing completed work in the ADU project.